TWIN CAPRIS!
In 2005, a lady at work asked me why I kept ignoring her when she would wave to me when we passed each other on the road. After she asked me, I thought she was crazy, and she thought I was crazy because I had no idea what she was talking about. It turns out someone had the same car and worked in a building about a half mile away from where I worked. I tracked him down and we took these pictures. Digital cameras were still new, so the quality isn't too great.
Mine is the one with ponies and the black hood vents.
Mine is the one with ponies and the black hood vents.
2003-2006 PICTURES
2014 PICTURES
When I was finishing putting the crate motor in, I was in a rush because I was probably going to be moving. I didn't want to trailer this thing, so I did what I had to do to get it ready to drive 300 miles. It made the trip fine, but there wasn't a whole lot of time to get everything in the engine bay all pretty the way I wanted it. That is how the car stayed, until I caught up on other things and finally had time to start working on it again. There is a lot of work to do, so here is the first part of cleaning this Frankenstein up.
I have been wanting to replace the bulb fixtures with some fluorescent strip lighting fixtures in the garage, and I realized again when taking these pictures that I have to get around to it.