INCANDESCENT TO LED CROSS REFERENCE
Map Lights (2 total, one on each side of overheard interior light with their own on/off switch)
GE 105 = 67
Interior light (1 total, turns on when doors are opened)
GE 912 = 921/T5
Instrument Panel Gauges (10 Total)
GE 194 = 194
So far this page hasn't led me wrong when cross-referencing:
https://www.superbrightleds.com/car-bulb-cross-reference/
GE 105 = 67
Interior light (1 total, turns on when doors are opened)
GE 912 = 921/T5
Instrument Panel Gauges (10 Total)
GE 194 = 194
So far this page hasn't led me wrong when cross-referencing:
https://www.superbrightleds.com/car-bulb-cross-reference/